1. Faster construction projects with CPM scheduling
Author: Woolf, Murray B.
Library: Central Library and Documents Center of Industrial University of Khaje Nasiredin Toosi (Tehran)
Subject: Superintendence ، Building,، Production scheduling,، Critical path analysis
Classification :
TH
438
.
4
.
W65


2. Faster construction projects with CPM scheduling
Author: Woolf, Murray B.
Library: (Semnan)
Subject: Superintendence ، Building,، Production scheduling,، Critical path analysis
Classification :
TH
438
.
4
.
W6F3


3. Faster construction projects with CPM scheduling
Author: / Murray B. Woolf.
Library: Tehran University, technical faculty libraries 1 (Tehran)
Subject: Building--Superintendence.,Production scheduling.,Critical path analysis.
Classification :
TH
438
.
4
.
W65
2007

